Wednesday, September 21, 2016

2016 Layout



Station Name Table
557 Engine Restoration 21
Alaska 511 - Navigator 41
AMATS Freight Mobility Study 20
Anchorage-Mat-Su Commuter Rail 19
Bicycle Safety 31
Big Lake Intersection Improvement 14
Bogard Road Extension East 7
Bogard Road Resurfacing 47
Bureau of Indian Affairs - Transportation 23
Central Region DOT&PF 40
Central Region Planning 35
Chickaloon Transportation Department 24
City of Palmer 18
Clapp/Mack Road Extension with Pathway 7
Don Young and Lu Young Lane 7
DOT&PF Statewide Planning 34
DOT&PF Civil Rights Office 33
DOT&PF Right-of-Way 62
DOT&PF Traffic and Safety 32
Enstar Natural Gas 27
Fairview Loop Rehabilitation, Phase 2 53
Fairview Loop, Signal at KGB 53
Glenn Hwy Capacity Improvement 56
Glenn Hwy Corridor 60
Glenn Hwy MP 34-42 Reconstruction 59
Glenn Hwy, MP 53-56 Reconstruction 58
Glenn Hwy, MP 66.5-92 57
Glenn/Muldoon Interchange 61
Government Peak Trail Illumination 15
Hatcher Alpine Xperience 15
Jim Creek Motorized Trail  15
Knik Goose Bay Road: Centaur to Vine 52
Knik River Road Spot Improvements 7
Knik-Goose Bay Road: Vine to Settler’s Bay 51
Life Cycle of a Road in the MSB 1
MSB 2035 Long Range Transportation Plan 12
MSB Aircraft Landing Sites & Public Safety 2
MSB Fish Passage Culvert Replacement 16
MSB Landscaping 4
MSB Paving Projects 4
MSB Planning: Air Quality 17
MSB Road Hotline 4
MSB Subdivision Road Development 4
MSB Maintenance 4
MSB Traffic Counts and Studies 22
MSB Trip Generation Report 3
Mat-Su Bridges 13
Mat-Su Community Transit (MASCOT) 25
Mat-Su Roads (Group A and B) Pavement 49
Mat-Su Roads (Group C) Pavement 48
Mat-Su Trails and Parks Foundation 30
Matanuska Electric Association 26
Museum Drive 8
Museum of Alaska Transportation, Industry 28
Old Glenn Hwy Paved Pathway 29
Palmer-Wasilla Hwy 63
Palmer-Wasilla Hwy, Eastern Terminus 64
Parks Hwy Alternative Corridor 35
Parks Hwy Bridge Replacement: Montana & 
Sheep Creek 46
Parks Hwy Corridor 42
Parks Hwy MP 90-99 – Rehabilitation 43
Parks Hwy MP 99-123.5 – Rehabilitation 43
Parks Hwy Passing Lanes, MP 83-163 43
Parks Hwy, MP 44-52 Phase 2 Construction 44
Parks Hwy, MP 44-52 Phase 3 45
Parks Hwy/Talkeetna Spur Pedestrian Imp. 38
Permits, Standards for Work 5
Port Mackenzie Rail Extension 21
Positive Train Control 21
Railroad Bridges and Crossings 21
Recreation Bond (Proposition B4) 6
Regional Aviation System Plan 39
Schrock Road Pavement Preservation 49
Seldon Road Extension, Phase 2 9
Seldon Road/Lucille Street, Phase 3 10
Seward Hwy Corridor 55
Seward Meridian Road, Phase II 54
Statewide Aviation 40
Sterling Hwy Corridor 36
Sunshine Clinic Transit 25
Talkeetna Airport Improvements 37
Trunk Road Extension South 11
Valley Mover 25
West Butte Parking Lot Trailhead 15
Wasilla Main Street Rehabilitation 50
Willow Fishhook, MP 37.7 to Parks Hwy  49

10 comments:

  1. Thank you for sharing the interesting information. As I hoped, these info will be useful to many people.
    hoa lan ho diep | civil engineering outsourcing | Outsourcing land development services

    ReplyDelete
  2. Excellent blog! Thank you for sharing worthy blog with us.

    toronto taxi rates

    ReplyDelete
  3. This comment has been removed by a blog administrator.

    ReplyDelete
  4. This comment has been removed by a blog administrator.

    ReplyDelete
  5. This comment has been removed by a blog administrator.

    ReplyDelete
  6. This comment has been removed by a blog administrator.

    ReplyDelete
  7. This comment has been removed by a blog administrator.

    ReplyDelete